Welcome to JA Coetzee WaterBoor Drilling
Get in touch with usWe have the ability to drill the following types of boreholes
- Augered Boreholes for Geotechnical investigations
- Cleaning/Re-opening of Existing boreholes (pending on conditions)
- Coal Dumps, various Material Stockpiles, Fly-ash dumps
- Drilling boreholes -300mm (12″) up to 300m
- Earthing of Boreholes
- Exploration Borehole and Rotary Air Flush
- Geophysical Sample Report
- Geophysical Survey
- Groundwater Control
- Monitoring
- Odex / Odex Shoe
- Quality Control Boreholes
- Service Boreholes for Underground Workings
Scope of work include:
* Borehole cap
* Borehole Disinfection
* Borehole Numbering
* Concrete Block and Cap
* Concrete Block 1m x 1m x 100mm for Palisade
* Concrete Collar (2m x 2m x 0,5m)
* Concrete, Crasher, Sand
* Data recording GPS & Logs
* Development time
* End Caps
* Finishing and cleaning
* Formation Stabilizer -Grouting
* Generator set (6.8kw)
* Palisade 2m x 2m X 1.8m Steel only
* Borehole cap
* Borehole Disinfection
* Borehole Numbering
* Concrete Block and Cap
* Concrete Block 1m x 1m x 100mm for Palisade
* Concrete Collar (2m x 2m x 0,5m)
* Concrete, Crasher, Sand
* Data recording GPS & Logs
* Development time
* End Caps
* Finishing and cleaning
* Formation Stabilizer -Grouting
* Generator set (6.8kw)
* Palisade 2m x 2m X 1.8m Steel only
* Lockable Manhole Box With Concete & Cap
* Solar Panel
* Plugging
* Sanitary seal -Bentonite
* Issuance of SANS Compliance Water Certificate
* Laboratories Testing of Water Chemical & Micobiology – SANS Compliance
* 5,000 L -10,000 l Tank & 3m – 5m Stand
Stone Plug for unsuccessful boreholes, 3m casing installed, concrete block constructed
* around casing. Clearly marked on casing lid
Complete Stainless Steel Electrical Submersible Pump Install, Incl Control box, Cable,
Fittings, Base plates, Cable joints, Galvanised elbow.)
* Scope of work exclude all Electrical Connections & Applications – Only done by Accredited / Qualified Electritian.
* Solar Panel
* Plugging
* Sanitary seal -Bentonite
* Issuance of SANS Compliance Water Certificate
* Laboratories Testing of Water Chemical & Micobiology – SANS Compliance
* 5,000 L -10,000 l Tank & 3m – 5m Stand
Stone Plug for unsuccessful boreholes, 3m casing installed, concrete block constructed
* around casing. Clearly marked on casing lid
Complete Stainless Steel Electrical Submersible Pump Install, Incl Control box, Cable,
Fittings, Base plates, Cable joints, Galvanised elbow.)
* Scope of work exclude all Electrical Connections & Applications – Only done by Accredited / Qualified Electritian.
1 (one) year guarantee on the Electrial Submersible Pump only for mechanical breakdown
AVILIABILITY WITHIN A WEEK FROM DATE OF ORDER & DEPOSIT PAYMENT IN ADVANCE
JA Coetzee WaterBoor Drilling






Get in touch with us
[fc id='1'][/fc]
Areas of service is:
Limpopo
Mpumalanga
Kwa-Zulu Natal